Tuesday, October 03, 2006
Links
Previous Posts
- Ready for the next blocks
- Concrete is poured and went well
- Ready for the second floor slab
- Starting the heavy forming
- Tie beams are being formed
- First block walls go up
- Pouring the slab
- Getting ready for the Slab
- Footers down and the first rows of blocks
- The footings are ready to pour

