Friday, September 15, 2006

Ready for the second floor slab



Having passed inspection, the forming is finalized and the concrete will be poured on Monday. It will take 100 cubic yards to pour the columns, tiebeams and slab along with the stairs.

0 Comments:

Post a Comment

<< Home