Having passed inspection, the forming is finalized and the concrete will be poured on Monday. It will take 100 cubic yards to pour the columns, tiebeams and slab along with the stairs.
The scaffolding and materials have been moved from 11th street and are being used to form the tie beams, columns, 2nd floor slab and stairs which will all be poured at one time.
The forming continues for the tie beams, columns, second floor slab and stairs. Material will be brought from the 11th Street location for this forming