Tuesday, September 19, 2006

Concrete is poured and went well



The concrete pour is done and the forms are starting to be stripped

Friday, September 15, 2006

Ready for the second floor slab



Having passed inspection, the forming is finalized and the concrete will be poured on Monday. It will take 100 cubic yards to pour the columns, tiebeams and slab along with the stairs.